Amphenol Advanced Sensors Digital Output IR Detector EVM KIT

Amphenol Advanced Sensors Digital Output IR Detector EVM KIT offers a user-friendly platform for evaluating digital output IR detectors. The software is designed for Windows-based operating systems which enables seamless communication and data management. The kit includes an I2C communication board, IR detector breakout board, USB cable, and signal connect cable. These kits provide quick installation, intuitive software, and data logging/downloading capabilities. This RoHS-compliant kit is ideal for sensor development and evaluation applications.

Features

  • Compatible with ZTPD-2210 series sensors
  • Data downloading/logging capabilities
  • Easy and quick installation
  • Intuitive software
  • Seamless communication and data management
  • User-friendly platform

Applications

  • Air quality monitoring
  • Appliance control
  • Building automation
  • CO₂ sensing
  • Environmental sensing
  • Gas detection
  • HVAC systems
  • Indoor air quality measurement
  • Smart home devices

Amphenol Advanced Sensors Digital Output IR Detector EVM KIT Evaluation Board Setting Overview

Amphenol Advanced Sensors Digital Output IR Detector EVM KIT Evaluation Board Setting Overview

Video

This TTI Tech Specs video on Amphenol Advanced Sensors Digital Output IR Detector EVM Kit demonstrates that these devices provide a user-friendly platform for evaluating digital output IR detectors. The software is designed for Windows-based operating systems, enabling seamless communication and data management.

See video transcript below

Video Transcript

You’ll want to evaluate your thermopile infrared sensor before selecting one to make sure it’s not a thermopile of rubbish. Amphenol Advanced Sensors Digital Output IR Detector EVM KIT makes evaluation quick and easy with a user-friendly platform and an intuitive software GUI designed for Windows-based operating systems allowing seamless communication and data management.

The EVM kit comes with an I2C communication board, an IR detector breakout board, a USB cable, and a signal connect cable and is compatible with Amphenol ZTPD-2210 series of thermopile digital output IR detectors. This kit features data downloading and logging capabilities that are ideal for sensor development and evaluation applications.

View more Amphenol Advanced Sensors resources