Phoenix Contact SPD Installation White Paper
Phoenix Contact White Paper on SPD installation per UL 1449 states that Type 1 SPDs may be placed on either side of the main disconnect, Type 2 must be installed after the main breaker, and Type 3 should be located at least 30 feet downstream, close to the load. Proper type selection and placement are essential for effective surge protection without excess.